This project involved the design and construction of 12 affordable homes, along with associated external works and infrastructure, delivered in partnership with Saint-Gobain Off-Site Solutions.
Client
Location
Contract Sum
Programme
42 Weeks
This project involved the design and construction of 12 affordable homes, along with associated external works and infrastructure, delivered in partnership with Saint-Gobain Off-Site Solutions. The homes were built using Enveo-Vent Solution, incorporating Thermistud closed timber panels and a Weberwall lightweight brick slip façade, offering a modern and energy-efficient construction method.
Located on two separate plots within a densely populated residential area, this site presented logistical and access constraints. It also required complex enabling works, including: Lowering of existing services, installation of extensive retaining walls and piling operations for ground stability.
This development meets both sustainability and quality standards and addressed the unique constraints of a tight urban infill site.
The Project team;
Employers Agent – The DEP Group Ltd
Architect – BTP Architects
Civil Engineer – AJP
Structural Engineer – AJP
Building Control – LABC
Structural Warranty – QAssure